1. JR EAST Train Simulator
  2. News

JR EAST Train Simulator News

Next route to be distributed

Thank you for playing JR EAST Train Simulator!

We hope you are all enjoying the Shin-etsu Line DLC and updates that were released on September 26 (Tuesday).

We received the following feedback about the Shin-etsu Line DLC

"Very nice line, high quality, beautiful scenery, coastal scenery and the sound of the waves are very soothing!"
"The train is quite enjoyable with multiple conductor announcements, long distance and high speed operation, and relaxing scenery along the line that you don't get in the city."
"I felt that the environmental sounds around each station, such as the sound of waves at Aomi River Station, wild birds, agricultural machinery, and cars idling in front of the station, were recorded with great care."

The production team is encouraged by all of the positive feedback and your candid reviews.
Thank you again for the many reviews and supportive comments.


Now, we would like to inform you of the next distribution schedule, which you have all been waiting for.


























[h4]The next DLC will be the Hachinohe Line, which will be the first diesel train in the fully-distributed version![/h4]
[h3]
  • Route: Hachinohe Line(八戸線)
  • Section: Outbound Hachinohe(八戸) ⇒ Kuji(久慈)
  • Model: Series Kiha E130-500 (2-car train)
  • Release date: Scheduled for October 31, 2023 (Tue.)
  • International sales price: US$34.99
[/h3]


The Hachinohe Line connects Hachinohe Station in Hachinohe City, Aomori Prefecture with Kuji Station in Kuji City, Iwate Prefecture.
The line was first opened in 1894 between Shiriuchi Station (now Hachinohe Station) and Hachinohe Station (now Hon'hachinohe Station), and was repeatedly extended and opened to service until 1930, when the line was extended to Kuji Station, bringing the Hachinohe Line into full service.
With the opening of the Tohoku Shinkansen bullet train line extension between Hachinohe and Shin-Aomori stations in December 2010, the line between Hachinohe and Aomori stations, which had previously been on the Tohoku Main Line, was transferred to Aomori Railway, and is now a line with no connections to other JR conventional lines.
In October 2013, "TOHOKU EMOTION," a sightseeing train with a restaurant space throughout the train, began operation between Hachinohe and Kuji Stations, mainly on Saturdays and holidays.
The train line is divided into two separate lines: one between Hachinohe Station and Same Station for urban transportation, and the other between Hachinohe and Kuji Station for interregional transportation.
The majority of the route runs along the coastline, including the Tanezaki Coast, a national scenic beauty spot and a breeding ground for petrels. From Hachinohe Station to Same Station, the line runs through factories and urban areas; from Same Station to Rikuchu-Nakano Station, it runs through rural areas and along the Pacific Ocean; and from Rikuchu-Nakano Station to Kuji Station, it runs through hilly areas. Some sections of the line offer views of the ocean, making it a popular route for passengers to see the ocean from the train windows.



We are working hard on the production so that we can inform you of the production status as soon as possible. Please look forward to further updates!

We will discuss JR EAST Train Simulator DLC Vol. 9 "Shin-etsu Line" live today.

Thank you for playing JR EAST Train Simulator!

In conjunction with the release of the 9th JR EAST Train Simulator DLC "Shin-Etsu Line," we will be holding a live YouTube distribution on Tuesday, September 26 at 7:00 p.m. Japan time to talk passionately about the latest DLC "Shin-Etsu Line" and the major update.
In addition to the usual members, the main line drivers and conductors of Niigata train crew depot who actually work on the Shin-Etsu Line will join us this time.
Please come and watch!

[previewyoutube][/previewyoutube]

https://store.steampowered.com/app/2602460/JR_____E129/


---------------------------------------------------------------------------------------------------------
[h3]\JR East Train Simulator official goods are now on sale!/[/h3]

https://store.steampowered.com/news/app/2111630/view/3640648066056425520?l=english
[h3]*Products are available for overseas sales to 228 countries and regions around the world through "WorldShopping BIZ," a cross-border EC compatible service, by accessing from the links provided.[/h3]
[h2]▶To purchase, please visit the JRE MALL page[/h2]

DLC No. 9 "Shin-etsu Line" is now available!

Thank you for playing JR EAST Train Simulator.
Thank you for your patience, we have started to distribute the 9th DLC "Shin-Etsu Main Line" today, September 26th (Tuesday)!

[h3]About the Route[/h3]
The Shin-etsu Line connects Takasaki Station in Takasaki City, Gunma Prefecture with Niigata Station in Niigata City, Niigata Prefecture.
In the past, a single line connected Takasaki Station to Niigata Station, but with the opening of the Shinkansen line to Nagano (now Hokuriku Shinkansen) in October 1997, the line between Yokokawa Station and Karuizawa Station, which runs parallel to the Shinkansen line, was discontinued. At that time, the remaining line between Karuizawa Station and Shinonoi Station was also transferred to Shinano Railway. In March 2015, the Hokuriku Shinkansen line extension between Nagano and Kanazawa stations opened for service, and management of the line between Nagano and Naoetsu stations was also transferred to Shinano Railway and Echigo TOKImeki Railway.
Currently, the Shin-etsu Line operating as JR EAST has three sections: between Takasaki Station and Yokokawa Station, between Shinonoi Station and Nagano Station, and between Naoetsu Station and Niigata Station. This DLC includes the section between Naoetsu Station and Niigata Station.
Omigawa(青海川) Station, located on the way to the station, is known as a station adjacent to the sea, along with Umi-Shibaura Station on the Tsurumi Line and Rikuzen-Otsuka Station on the Senseki Line, where you can watch the sun set over the Sea of Japan from the platform.The train runs along the seaside section of the Sea of Japan between Naoetsu Station and Kashiwazaki Station, and between Kashiwazaki Station and Niigata Station, it runs through the rural landscape that symbolizes Niigata as a rice-producing region.

[previewyoutube][/previewyoutube]

[h3]Points of Appeal[/h3]
[h4]
  • Driving with a view of the Sea of Japan is possible!
  • Capable of long-distance operation with a total length of 136.3 km!
  • Environmental sounds during station stops recorded at the actual site are implemented!
    (Naoetsu Station, Omigawa Station, Kashiwazaki Station, Nagatori Station, Nagaoka Station, Tokoji Station, Echigo-Ishiyama Station, Niigata Station)
  • Actual voice broadcasts by the current train conductor are implemented! (Broadcasting is handled by the Niigata Train crew depot.)
[/h4]

[h3]Route Information[/h3]
  • Section: Shin-etsu Line Outbound Naoetsu ⇒ Niigata
  • Total length: 136.3 km
  • Number of Stations: 42
  • Security equipment: ATS-Ps/ATS-P

[h3]Train schedules that can be operated[/h3]
  • Train Number:1327M
  • Type/Destination: Local train to Nagaoka
  • Section where you can drive: Naoetsu to Nagaoka
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:1323M
  • Type/Destination: Local train to Niigata
  • Section where you can drive: Kashiwazaki to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:431M
  • Type/Destination: Local train to Niigata
  • Section where you can drive: Nagaoka to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:3481M
  • Type/Destination: Rapid train to Niigata
  • Section where you can drive: Nagaoka to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:2523M
  • Type/Destination: Local train to Niigata
  • Section where you can drive: Niitsu to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

[h3]International sales price: US$39.99[/h3]

https://store.steampowered.com/app/2602460/JR_____E129/?beta=0



[h3]The following features have been added and modified for the release of the DLC.[/h3]
    【Chuo Line Rapid Service DLC】
  • Actual voice broadcasts by the current train conductor are implemented. (Broadcasting is handled by the Toyoda Train crew depot.)
    [previewyoutube][/previewyoutube]
    【Joban Line DLC】
  • Fixed an event in which the timetable displayed on the TIMS screen was off by 15 seconds.
  • Corrected pilot lamp lighting timing.
  • Added speed limits (35, 45, 40, and 40 km/h) at turnouts after departing Ueno Station
  • Fixed embedding misalignment of the first blocking signal between Kashiwa and Kita-Kashiwa stations.
  • Corrected the slope indication before Hitachinoushiku Station (the 10‰ and 3.3‰ sections were indicated as "downhill" when "uphill" was justified).
  • Fixed an issue in which broadcasts were overlapped at express train waiting stations when "Station Waiting Time Skip" was set in the system settings.

    【Yamanote Line DLC】
  • Corrected slope indication between Ikebukuro and Mejiro stations.
  • Fixed a bug in the 876G scenario where the ATC emergency brake was applied just before arrival at Tamachi Station.
  • In the 876G scenario, the timing of the door-closing reminder announcement during station stops has been changed to after the departure bell rings.

    【Oito Line DLC】
  • In the 3241M scenario,aspects of the home signal at Shinano-Matsugawa Station are corrected.
  • In the 3241M scenario, the announcement "We will stop for a short while to allow trains to pass each other" was deleted at Ichinichiba, Toyoshina, and Shinano-Matsugawa stations because the preceding train had arrived first.

    【Saikyo Line ・ Kawagoe Line DLC】
  • Corrected an issue in the 759K scenario where the train was forced to stop in the air section when a stop signal was given due to an approaching train.

    【Keihin-Tohoku Line・Negishi Line】
  • Corrected gradient indication at Oimachi station.

    【Train schedule Selection Screen】
  • Fixed the speed at which text scrolling flows.

    【Other】
  • Correction of the event in which the density of UV glass in the cab of E233 series returned to the state before the modification.

[h3]If you like this update and the Shin-etsu Line DLC, we would appreciate it if you could reflect this in your review ratings.
Your reviews are the driving force behind our work.
[/h3]

We will continue to update the site based on your reviews and comments.

Shin-etsu Line DLC will finally be released on Tuesday, September 26!

Thank you for playing JR EAST Train Simulator!
We are pleased to announce the Shin-etsu Line DLC, which will finally go on sale on September 26th (Tuesday).


*The screen is under development and the contents may change from the time of release.


▲Photographs taken during coverage of E129 Series trains.

[h3]Points of Appeal[/h3]
[h3]
  • Driving with a view of the Sea of Japan is possible!
  • Capable of long-distance operation with a total length of 136.3 km!
  • Environmental sounds during station stops recorded at the actual site are implemented!
    (Only 3 stations: Naoetsu, Omigawa, and Kashiwazaki Stations)
  • Actual voice broadcasts by the current train conductor are implemented! (Broadcasting is handled by the Niigata Train crew depot.)
[/h3]

[h3]About the Route[/h3]
The Shin-etsu Line connects Takasaki Station in Takasaki City, Gunma Prefecture with Niigata Station in Niigata City, Niigata Prefecture.
In the past, a single line connected Takasaki Station to Niigata Station, but with the opening of the Shinkansen line to Nagano (now Hokuriku Shinkansen) in October 1997, the line between Yokokawa Station and Karuizawa Station, which runs parallel to the Shinkansen line, was discontinued. At that time, the remaining line between Karuizawa Station and Shinonoi Station was also transferred to Shinano Railway. In March 2015, the Hokuriku Shinkansen line extension between Nagano and Kanazawa stations opened for service, and management of the line between Nagano and Naoetsu stations was also transferred to Shinano Railway and Echigo TOKImeki Railway.
Currently, the Shin-etsu Line operating as JR EAST has three sections: between Takasaki Station and Yokokawa Station, between Shinonoi Station and Nagano Station, and between Naoetsu Station and Niigata Station. This DLC includes the section between Naoetsu Station and Niigata Station.
Omigawa(青海川) Station, located on the way to the station, is known as a station adjacent to the sea, along with Umi-Shibaura Station on the Tsurumi Line and Rikuzen-Otsuka Station on the Senseki Line, where you can watch the sun set over the Sea of Japan from the platform.The train runs along the seaside section of the Sea of Japan between Naoetsu Station and Kashiwazaki Station, and between Kashiwazaki Station and Niigata Station, it runs through the rural landscape that symbolizes Niigata as a rice-producing region.

[h3]Route Information[/h3]
  • Section: Shin-etsu Line Outbound Naoetsu ⇒ Niigata
  • Total length: 136.3 km
  • Number of Stations: 42
  • Security equipment: ATS-Ps/ATS-P


[h3]Train schedules that can be operated[/h3]
  • Train Number:1327M
  • Type/Destination: Local train from Naoetsu to Nagaoka
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:1323M
  • Type/Destination: Local train from Kashiwazaki to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:431M
  • Type/Destination: Local train from Nagaoka to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:3481M
  • Type/Destination: Rapid train from Nagaoka to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

  • Train Number:2523M
  • Type/Destination: Local train from Niitsu to Niigata
  • Type of train: Series E129, 4 cars
  • Responsible for real voice train announcements: Niigata train crew depot

[h3]International sales price: US$39.99[/h3]

The store page is also open to the public today.

https://store.steampowered.com/app/2602460/JR_____E129/?beta=0

[h3]The following updates are planned to coincide with the release of the DLC. [/h3]
[h3]
    【Chuo Line Rapid Service DLC】
  • Actual voice broadcasts by the current train conductor are implemented. (Broadcasting is handled by the Toyoda Train crew depot.)
    【Joban Line DLC】
  • Fixed an event in which the timetable displayed on the TIMS screen was off by 15 seconds.
  • Corrected pilot lamp lighting timing.
  • Added speed limits (35, 45, 40, and 40 km/h) at turnouts after departing Ueno Station
  • Fixed embedding misalignment of the first blocking signal between Kashiwa and Kita-Kashiwa stations.
  • Corrected the slope indication before Hitachinoushiku Station (the 10‰ and 3.3‰ sections were indicated as "downhill" when "uphill" was justified).
    【Yamanote Line DLC】
  • Corrected slope indication between Ikebukuro and Mejiro stations.
  • Fixed a bug in the 876G scenario where the ATC emergency brake was applied just before arrival at Tamachi Station.
  • In the 876G scenario, the timing of the door-closing reminder announcement during station stops has been changed to after the departure bell rings.
    【Oito Line DLC】
  • In the 3241M scenario,aspects of the home signal at Shinano-Matsugawa Station are corrected.
  • In the 3241M scenario, the announcement "We will stop for a short while to allow trains to pass each other" was deleted at Ichinichiba, Toyoshina, and Shinano-Matsugawa stations because the preceding train had arrived first.
    【Saikyo Line ・ Kawagoe Line DLC】
  • Corrected an issue in the 759K scenario where the train was forced to stop in the air section when a stop signal was given due to an approaching train.
    【Keihin-Tohoku Line・Negishi Line】
  • Corrected gradient indication at Oimachi station.
    【Train schedule Selection Screen】
  • Fixed the speed at which text scrolling flows.
    【Others】
  • Correction of the event in which the density of UV glass in the cab of E233 series returned to the state before the modification.

[/h3]

Please look forward to the release date!

Next route to be distributed

Thank you for playing JR EAST Train Simulator!

We hope you are all enjoying the Joban Line DLC and major update that was released on August 29.

Some users commented on the Joban Line DLC, "I can enjoy the change of scenery along the line, from the city center with its many high-rise buildings to the quiet countryside!" and "The dead sections are so realistic and fun!"
We have also received a number of positive comments and candid reviews about the major update, such as "I was surprised by the huge amount of the new schedule," and "I really enjoyed driving while anticipating the rapidly changing signal indications, which is a completely different experience from the previous off-peak periods, even on the same route. The production team is encouraged by these comments.
Thank you again for the many reviews and supportive comments.


Now, we would like to inform you of the next distribution schedule, which you have all been waiting for.


























[h4]The next DLC will be distributed for the Shin-etsu Line, which will be the first Niigata area![/h4]
[h3]
  • Route: Shin-etsu Line(信越本線)
  • Section: Outbound Naoetsu(直江津) ⇒ Niigata(新潟)
  • Model: Series E129 (4-car train)
  • Release date: Scheduled for September 26, 2023 (Tue.)
  • International sales price: US$39.99
[/h3]
*[Apology] An error was made in the monetary amount when the article was posted. We apologize for the error and correct it. (Added on 9/8)


The Shin-etsu Line connects Takasaki Station in Takasaki City, Gunma Prefecture with Niigata Station in Niigata City, Niigata Prefecture.
In the past, a single line connected Takasaki Station to Niigata Station, but with the opening of the Shinkansen line to Nagano (now Hokuriku Shinkansen) in October 1997, the line between Yokokawa Station and Karuizawa Station, which runs parallel to the Shinkansen line, was discontinued. At that time, the remaining line between Karuizawa Station and Shinonoi Station was also transferred to Shinano Railway. In March 2015, the Hokuriku Shinkansen line extension between Nagano and Kanazawa stations opened for service, and management of the line between Nagano and Naoetsu stations was also transferred to Shinano Railway and Echigo TOKImeki Railway.
Currently, the Shin-etsu Line operating as JR EAST has three sections: between Takasaki Station and Yokokawa Station, between Shinonoi Station and Nagano Station, and between Naoetsu Station and Niigata Station. This DLC includes the section between Naoetsu Station and Niigata Station.
Omigawa(青海川) Station, located on the way to the station, is known as a station adjacent to the sea, along with Umi-Shibaura Station on the Tsurumi Line and Rikuzen-Otsuka Station on the Senseki Line, where you can watch the sun set over the Sea of Japan from the platform.The train runs along the seaside section of the Sea of Japan between Naoetsu Station and Kashiwazaki Station, and through the countryside between Kashiwazaki Station and Niigata Station.



We are working hard on the production so that we can inform you of the production status as soon as possible. Please look forward to further updates!