Devblog for August 2020
With the code rot of year long prototype code impeding new designs, it was a month of rewrites and redesigns. The month started slow, going back to the drawing board multiple times, but it ended with new and much better systems for train and line scheduling. And experimentation with building generation continued.
https://carloscarrasco.com/nimby-rails-august-2020/
https://carloscarrasco.com/nimby-rails-august-2020/