1/31(Wed) Minor correction
The following modifications have been made.
[h4][/h4]
[h4][/h4]
-
【All Routes】
- In some PC environments, the "0 second fusing success!!!!" display did not appear in some PC environments has been corrected.
【Chuo Line Rapid Service DLC】 - Incorrect slope setting between Yotsuya and Ochanomizu Stations has been corrected.
Before correction: 8.3‰ upstream → After correction: 8.3‰ downstream
【Koumi Line DLC】 - Added downhill gradient limit (70 km/h).
Between Nobeyama Station and Shinano-Kawakami Station, and between Shinano-Kawakami Station and Saku-Hirose Station - Corrected the Accel and brake performance of Kiha E200.
・Acceleration performance of 2 to 5 notches of power
・Speed range where regenerative braking begins
・Braking force of the air brake
(Reflection of points raised by active drivers belonging to the Koumi train crew depot)