Patch notes: V 0.2.05.024
The following fixes have been made:
The following improvements have been made:
I had planned not to introduce changes or improvements until all the bugs were fixed and the game stabilized, but I'm seeing that there's a lot of confusion with the reactor shutdown protocol, and a lot of complications to understand what's going on.
For this reason, I added a new function in AO, in the request for help section, so that AO can analyze the situation of the reactor, in relation to the shutdown, and report the status: normal and safe cooling speed, slow cooling or possibly impossible cooling, and an explanation of the factors that, if they do not change, produce that situation.
- Fixed the visual error when trying to activate the tablet while entering a value on the virtual numeric keyboard.
- Fixed issue with purchased items not showing as reserved on the map when delivered and under construction.
- Fixed the bug that prevented the batteries from charging when they had reached 0%.
- Fixed the error that displayed the message "Are you sure you want to discard x?" after loading a savegame.
- Made adjustments so that the trash can better recognize when trying to dispose of a spare.
- The maximum number of batteries that can be stored was corrected.
- Adjusted repair costs, as they were wrongly high.
- The description of the element to be repaired when it is a water circulation pump was improved.
- Changed the available upgrade validation to show the cost even if it is not available.
- Fixed bug with saving progress, where in certain circumstances, it would not correctly save upgrades for some machines.
The following improvements have been made:
I had planned not to introduce changes or improvements until all the bugs were fixed and the game stabilized, but I'm seeing that there's a lot of confusion with the reactor shutdown protocol, and a lot of complications to understand what's going on.
For this reason, I added a new function in AO, in the request for help section, so that AO can analyze the situation of the reactor, in relation to the shutdown, and report the status: normal and safe cooling speed, slow cooling or possibly impossible cooling, and an explanation of the factors that, if they do not change, produce that situation.